Trade Fair Lead → First Bilingual Inquiry and Quote Handoff

By Keptrow · · 2 min read

Trade fair lead → first bilingual inquiry and quote handoff: what to send in the first 24–48 hours — not a Day 1–90 campaign.

After Canton Fair or any trade show, the highest-leverage move is one clear confirmation email while the meeting is fresh. The long nurture sequence already exists here: How to follow up after a trade show. This page stops at first inquiry → quote handoff.

Only one job in the first 48 hours

Send a bilingual confirmation that:

  1. Thanks them for stopping at the booth / meeting.
  2. Restates one need you heard (product, market, cert, or timeline).
  3. Asks for the missing spec or quantity needed to quote.
  4. Says when you will send the quotation once those details arrive.

Template pack: Bilingual inquiry email ZH–EN. Opening lines you practiced before the show: opening cards · booth opening script · on-floor tracks.

Hand off to quotation

When the inquiry is complete enough to price:

If the deposit stalls

One branch only on this page: if they went quiet after agreeing payment terms, use a short bilingual chase — payment chase email ZH–EN — rather than rewriting your whole sequence.

Full Day 1–90 lives elsewhere

For graded A/B/C touches across three months, use How to follow up after a trade show. Linking there on purpose so search engines and readers see two different jobs: first handoff (this page) vs long rhythm (that page).

Cards still on your desk? One line — sort them in a sheet: Organize business cards in Excel.

Get bilingual inquiry email

FAQ

How soon should I send the first email after the fair?

Within 24–48 hours for A leads you met in person. Same-evening is better when you promised it at the booth.

Should the first email include the full quotation?

Only if you already have specs and quantity. Otherwise confirm the need and ask for the missing inputs, then quote.

Is this the same as the Day 1–90 guide?

No. This page is the first inquiry and quote handoff. The Day 1–90 guide covers the longer cadence.

What if they delay the deposit after quoting?

Use the bilingual payment chase pack for that branch.